[00:00:02]
[CALL TO ORDER]
DONNA, DO WE HAVE ANY PUBLIC COMMENT? NO, SIR, WE DO NOT.[2. TOPICS]
AND I'LL INTRODUCE CITY MANAGER BILL KILLINGSWORTH FOR THAT.THANK YOU. MAYOR. GOOD EVENING COMMISSION. SO IT'S AUGUST 11TH.
THIS IS PUBLIC UTILITIES. THIS IS KIND OF THE LAST DEPARTMENT BY DEPARTMENT WORKSHOP ON AUGUST 25TH.
WE'LL HAVE AN OVERVIEW THAT WILL BY THAT TIME ALL OF OUR REVENUE NUMBERS WILL BE MUCH TIGHTER.
AND WE'LL GO THROUGH ALL THE ENHANCEMENTS. AND YOU'VE SEEN THE DEPARTMENT HEADS PRIORITIES.
WHAT I'M GOING TO DO IS I'LL PRIORITIZE THEM AS A GROUP.
AND THEN YOU GUYS CAN PRIORITIZE THEM AS A COMMISSION.
WE'LL SEE WHAT MOVES FORWARD IF WE CAN GO ON TO THE NEXT SLIDE DONNA.
ONE MORE. SO PUBLIC UTILITIES, THAT'S, THEY'RE OBVIOUSLY RESPONSIBLE FOR SAFEGUARDING THE PUBLIC HEALTH AND THE ENVIRONMENT BY OPERATING OUR POTABLE WATER AND WASTEWATER SYSTEMS. WE CAN GO ON TO THE NEXT SLIDE. YOU'LL SEE THE EXPENDITURES BY DIVISION.
SO WHAT YOU'RE GOING TO SEE IS QUITE A DECLINE IN THE PROPOSED BUDGET.
SO IN WATER WAS A 9.6 MILLION IN 2025, WE'RE LOOKING AT 4.6 AND 26.
AND THEN SEWER WAS 11.4, AND WE'RE LOOKING AT 8.9 GIVE OR TAKE IN 26.
AND WHAT YOU WILL SEE, THE REASON FOR THAT IS AS WE GET INTO WATER, GO ON TO THE NEXT SLIDE.
PERSONNEL SERVICES THAT'S BASICALLY THE SAME.
OPERATING EXPENSES IS UP A LITTLE BIT 6%. DEBT SERVICE IS A LITTLE BIT DOWN, BUT BASICALLY THE SAME.
AND WHAT YOU'RE GOING TO SEE IS CAPITAL OUTLAY IS FROM 6.2 MILLION DOWN TO $1 MILLION.
WE'RE THINKING TWO YEARS, AND THAT WILL BE THE LAST MAJOR PROJECT AT OUR WATER PLANT.
NEXT YEAR WE HAVE THE LAST CHLORINE. WE'RE GETTING RID OF THE LAST CHLORINE TANK RIGHT? WE'RE WORKING ON THAT NOW. SO WE LOCATED THE CURRENT FISCAL YEAR.
SO, IF I MAY ASK, WHILE YOU'RE GOING HERE. SURE.
I'M GETTING A SENSE THAT WE MAY HAVE SEVERAL YEARS OF LOWER NEEDS FROM THE ENTERPRISE FUND FOR CAPITAL OUTLAYS WITHIN THE PLANTS. WITHIN THE PLANTS, YEAH. SO THE NEXT TWO BIG THINGS ARE LOOKING TO 2032 WOULD BE WHATEVER WE WILL NEED TO SPEND TO MOVE OUR WASTEWATER TO WHEREVER WE ARE GOING TO MOVE IT TO.
IN WHAT? WHEN? 2032. OH. YOU GOING OUT OKAY. I HOPE I'M STILL ALIVE.
STILL [INAUDIBLE]. YEAH. YEAH, BUT WE'RE GOING TO.
BUT WE WILL HAVE, WE HAVE TO BE COMPLIANT THEN, WHICH MEANS WE'LL HAVE TO DO IT BEFORE THEN.
BUT THE NEXT BIG THING I THINK, FOR US IS GETTING A HANDLE OF OUR INFILTRATION CITYWIDE.
SO, YOU KNOW, ONE OF THE THINGS THAT WILL HELP US AND WHATEVER APPROACH WE END UP TAKING IN TERMS OF WHERE WE PUT OUR WASTEWATER, IS REDUCING THE AMOUNT OF WATER THAT WE PRODUCE AS WASTEWATER.
YEAH. DO WE HAVE A WAY OF KNOWING WHERE THE INFILTRATION IS COMING FROM? YES. I MEAN, I KNOW THE ORANGEBURG PIPES ALL BEAT.
SO WE HAVE RECOMMENDATIONS FOR SOME PARTS OF THE CITY.
WE HAVEN'T IMPLEMENTED THEM YET. IS THAT CORRECT, TROY? BUT WE WE HAVE THE REPORTS ON WHAT WE SHOULD FIX.
AND THEN WE HAVE NOT SMOKE TEST THE WHOLE CITY, SO WE'LL DO THAT.
MAYBE NOT THAT MUCH, BUT. A SIGNIFICANT AMOUNT.
7%. YEAH, SO. SO IT'S COMING FROM. IT'S COMING FROM THE GROUNDWATER, STORMWATER, SOMEWHERE, RIGHT? EITHER THE GROUNDWATER IS COMING UP HIGH ENOUGH THAT IT CAN LEAK IN, OR THE STORMWATER IS COMING IN THROUGH OUR STORM DRAINS AND GETTING INTO THE SYSTEM.
SO THAT WOULD BE THE NEXT BIG CAPITAL. WELL, NOW THAT WE GOT THE PLANTS DONE, BUT THE STORAGE TANK.
THAT'S ABOUT A $1.5 MILLION PROJECT. WHEN IT'S TAKING THE OLD ONE OUT AND PUTTING IN A NEW ONE.
[00:05:03]
IT'LL BE ABOUT 1.5 MILLION. ALL RIGHT. GO ON.YES, SIR. THANK YOU. GO ON TO THE NEXT SLIDE.
SO, SEWER, YOU'RE GOING TO SEE THE SAME THING.
WE DO HAVE A LITTLE JUMP IN PERSONAL SERVICES HERE, ABOUT 11%.
IT'S DUE TO AN INCREASE IN OVERTIME AND OUR 401 CONTRIBUTIONS.
SO OUR MATCH REQUIREMENTS. OPERATING EXPENSES IS ABOUT THE SAME.
DEBT SERVICE IS ABOUT THE SAME. AND AGAIN, YOU'RE GOING TO SEE THE SAME THING. THE CAPITAL OUTLAY.
THERE WAS A BIG DROP THERE ABOUT, YOU KNOW, $1.7 MILLION OR SO.
SO IT'S, THAT'S WHAT YOU'RE SEEING. OUR OPERATING COSTS ARE BASICALLY THE SAME.
BUT OUR CAPITAL OUTLAY COST IS BEING REDUCED SUBSTANTIALLY.
CAN I ASK YOU A QUESTION? YES. SO THE DEBT SERVICE THERE, THE 1.2.
WELL, YOU KNOW, MAYBE IT'S NOT A SMART QUESTION.
WHY DO WE HAVE THAT? AND WHY DON'T WE PAY THAT OFF? WELL, IT'S GOING TO BE PAID OFF IN OCTOBER. OKAY, WELL, THAT'S A GOOD ANSWER.
YEAH. IT IS. YEAH. OKAY. TIMELY QUESTION ABOUT TEN YEARS LATE, BUT YEAH.
WELL DONE. YEAH. NO I MEAN THAT'S A SIGNIFICANT AMOUNT.
YEAH. OKAY. THANKS. ALL RIGHT. CAN I JUST REAL QUICKLY ASK ON THE THE OVERTIME FOR PERSONNEL EXPENSES? IS THAT SOMETHING THAT NEEDS TO BE CURED WITH ANOTHER HIRE? ARE WE DOWN A MAN OR WOMAN? IS IT JUST A ONE YEAR EVENT? YOU WANT TO TALK TO THAT, TROY? SO THIS PAST YEAR, WE HAVE FINALLY, RIGHT NOW WE'RE BACK UP TO FULL STAFF AT THE WASTEWATER PLANT.
BUT WE'VE HIRED WITHIN, AND THEY BECAME OPERATORS AS WE GO.
SO THAT ACTUALLY SHOULD START COMING DOWN, MOVING FORWARD.
YEAH, THAT'S. WE'RE FULLY STAFFED AT THIS POINT.
EXCELLENT. THANKS. YES. IS IT ALSO CONTRIBUTED TO MAYBE SOME, YOU KNOW, AFTER OUR EMERGENCY SERVICES WHERE YOU GUYS, YOU KNOW, YOU HAVE A BROKEN PIPE OF SOME SORT, YOU HAVE TO ATTEND TO OUR THING.
OF COURSE, I MEAN, THAT PLAYS IN AS WELL. I MEAN, THAT'S THE OVERTIME IS YOU'VE GOT THE COLLECTION SYSTEM THAT THAT MAY HAVE A BREAKOUT THERE. YOU ALSO HAVE, BUT MOST OF US, THE WASTEWATER PLANT AND A LOT OF IT'S CONTRIBUTED TO THE REUSE SYSTEM TRYING TO KEEP IT UP AND RUNNING SO WE CAN KEEP IT, YOU KNOW, KEEP WATER OUT THERE. OH I SEE. OKAY.
SO A LOT OF IT'S COMING IN AND CHECKING CHLORINE RESIDUALS.
THEY GET CALLED FOR A LOW CHLORINE RESIDUAL FOR THE RECLAIM.
AND THEY GOT TO COME IN AND FIX WHATEVER ISSUE IT IS.
AND. OH, I'M SORRY. I WAS JUST GONNA SAY AS A FOLLOW UP, DO YOU HAVE LIKE STAGGERED SHIFTS LIKE.
AND THEN WE HAVE A GUY COMING IN AT NOON AND WORK TILL 8:00.
OKAY. YEAH. SO JUST CURIOUS SINCE LATELY THERE'S BEEN NUMEROUS CONVERSATIONS ABOUT THE REUSE SYSTEM.
IS IT TURNING OUT LOOKING, YOU KNOW, 2020 HINDSIGHT, IS IT COSTING US A LOT MORE THAN WE EVER THOUGHT IT WOULD COST US TO EMPLOY THAT? AT THIS POINT, I WOULD SAY YES. I MEAN, WE'RE BUILT OUT, AND WE HAVE SPENT A LOT OF MONEY INTO IT.
I DON'T KNOW THAT WE'VE. I THINK IT'S PROBABLY SOMETHING WE GOT TO LOOK AT. MAYBE START CHARGE A LITTLE BIT MORE MONEY FOR THAT, FOR THAT SERVICE. WE HAVEN'T DONE ANY ADJUSTMENTS IN 13 YEARS ON THAT, SO PROBABLY IT'S TIME TO START LOOKING AT IT.
ALL RIGHT. THANK YOU. TROY. ON THE RECLAIMED WATER THAT WE'RE PUTTING INTO THE CLUB POND.
WE WERE LOOKING AT STORING THAT ON SITE SO THAT WE COULD CONTROL THE EBB AND FLOW OF PRODUCTION.
IS THAT SOMETHING WE'RE LOOKING AT THIS THIS CURRENT YEAR WITH? 2026, SO WE HAVE A WE HAVE A POND ON SITE AT THE WASTEWATER PLANT, SO 3 MILLION GALLON POND.
WE CALL IT A POLISHING POND. IT'S, I MEAN THAT'S, IT SITS THERE BEFORE IT GOES OUT TO THE RIVER.
RIGHT. THAT WATER NEVER MAKES IT TO THE GOLF COURSE.
WE'RE PROPOSING ON USING THAT WATER FOR THE GOLF COURSE.
SO TO ANSWER YOUR QUESTION, 2026, WE'RE TRYING TO UTILIZE THAT WATER FOR THE GOLF COURSE.
INTERESTING. SO WE GOT TO GET ENGINEERED. THERE'S A COUPLE OF THINGS WE GOTTA, HURDLES WE GOTTA GET OVER, BUT THE WATER'S THERE. WE JUST GOT TO BE, WE GOT TO FIGURE OUT HOW NOT TO METER IT MORE THAN TWO TIMES AND WE GOTTA RECORD IT.
THERE'S A LITTLE BIT OF HURDLE THERE, BUT WE CAN.
WE'LL GET THERE. OKAY. BUT THERE'S NOT A, IT'S NOT AN ENHANCEMENT.
SO IT'S BUILT INTO YOUR OPERATING BUDGET. IT'S ACTUALLY AN ENHANCEMENT.
I BELIEVE IT'S IN THERE. I THINK IT IS. I BELIEVE IT IS.
I WAS LOOKING FOR IT. I COULDN'T FIND IT, BUT THAT DOESN'T MEAN IT'S NOT THERE. YOU MAY BE CORRECT,
[00:10:02]
BUT I THOUGHT IT WAS THERE. WE CAN TALK ABOUT THAT WHEN WE GET TO THE.OKAY. WHICH WILL BE VERY SHORTLY. YEAH. GO AHEAD TO THE NEXT SLIDE. GO ON TO THE NEXT ONE. THAT ONE SHOULD HAVE.
BRING IT ON TO THE NEXT SLIDE. YOU'LL SEE THE SEWER, I'M NOT GOING TO GO THROUGH THEM ALL LINE BY LINE, BUT YOU HAVE THEM AND THEN WE'LL GO TO THE ENHANCEMENTS, AND AGAIN, I'M NOT GOING TO GO THROUGH THESE LINE BY LINE, BUT AS YOU'LL SEE, MOST OF THESE ENHANCEMENTS WITH THE EXCEPTION OF A COUPLE SANDBLASTING OR GROUND STORAGE TANKS. AND THERE WAS A, SEEMED LIKE THERE WAS ONE MORE THAT WAS MAYBE NOT.
MOST OF THEM ARE NOT VERY EXPENSIVE. SO EVEN EVEN IF YOU ROLL ALL OF THE REQUESTED ENHANCEMENTS IN THE PUBLIC UTILITIES BUDGET, THEY'RE STILL GOING TO END UP LIKE $5 MILLION UNDER WHAT THEY WERE LAST YEAR.
YEAH. YEAH. QUESTION. DID YOU WATCH THE LAST, WHEN WE HAD THE MAYOR IN NEPTUNE IN HERE TO TALK ABOUT WATER? I DID, OKAY. I DID. AND ONE OF THE QUESTIONS, I FORGET WHO ASKED IT, BUT WHAT WOULD BE THE IMPACT FOR US ON THE OTHER SIDE? YOU KNOW, TO LOOK, YOU KNOW, OBVIOUSLY THEY PAY FOR WHATEVER.
AND I'M SURE BILL IS GOING TO PUT THAT IN THE AGREEMENT, BUT IS THERE, IS IT, WHAT WOULD IT COST US ON THE OTHER SIDE? IT WOULD REALLY BE NO MORE DIFFERENT THAN WE HAVE A FIRE ON OUR SIDE.
YEAH. THE WATER'S JUST GOING TO BE SITTING THERE READY TO BE USED.
THERE'S NO INFRASTRUCTURE THAT YOU WOULD TAKE.
THAT WE WOULD PAY FOR NO, I MEAN, IT WOULD ALL COME FROM THE. YEAH, THAT'S WHAT I THOUGHT, BUT THAT'S WHAT WE SAID. BUT YOU KNOW, IT'S CURIOUS IS IT. DOES THAT SYSTEM LOSE PRESSURE OVER TIME? YOU GOTTA YOU HAVE TO KIND OF KEEP IT PRIMED.
NO, IT WOULD IT WOULD STAY THERE. I MEAN WATER, YOU KNOW, IT'S LIKE ANYTHING ELSE.
IT'S AS LONG AS THERE'S NO LEAKS. YEAH. THE PRESSURE WILL STAY THERE.
A LEAK WILL SHOW UP AS WELL, I MEAN, BUT I WOULDN'T ANTICIPATE IT'S GOING TO BE BUILT CORRECTLY AND ALL THAT GOOD STUFF, SO I WOULDN'T I WOULDN'T BE WORRIED ABOUT THAT.
OKAY. MAYOR. YES. SO TO BRUCE'S QUESTION. SO YOU'RE SAYING THERE'S NO INCREMENTAL COST TO US TO KEEP THE PRESSURE OR PRESSURE TO THEM? YOU KNOW, IT'S JUST A MATTER OF REALLY HOOKING THINGS UP, AND IT'S NO, YOU KNOW, NO EXPENSE TO US UNTIL THEY POTENTIALLY HAVE TO USE IT.
EXACTLY. I MEAN, IT WOULD BE NO DIFFERENT THAN ANY OTHER FIRE IN THIS ATLANTIC BEACH.
I MEAN, IT WOULD BE NO DIFFERENT. SO IT'S JUST THE PIPE IS THERE, IT'S PRESSURIZED.
AND IF THEY USED IT, THEN OF COURSE THEY'D HAVE A LITTLE DRAW ON OUR SYSTEM.
COMMISSIONER RING. COULD WE LOOK INTO MAKING SURE THE METER IS ON OUR SIDE AND NOT MONITORED BY NEPTUNE BEACH? SO THE METER WILL PROBABLY BE ON THEIR SIDE, IN A VAULT.
OKAY. THERE'S JUST, THERE'S NOT ENOUGH ROOM ON OUR SIDE AS FAR AS WHAT THE PLANS I'VE SEEN.
BECAUSE THEY'RE GOING TO HAVE TO GO MUCH DEEPER THAN WHAT THE PIPE IS NOW. RIGHT.
SO THEY'RE GOING TO HAVE TO TAP BACK A LITTLE FURTHER ON SHERRY DRIVE AND GO DOWN.
SO IT'S GOING TO COME UP AND IT'LL PROBABLY BE, THE METER WILL PROBABLY BE ON NEPTUNE BEACHSIDE. BUT IT'S NOT THAT WE CAN'T, WE CAN STILL READ IT. OKAY. YEAH WE'LL READ IT. ARE YOU APPREHENSIVE ABOUT THAT? DOES THAT MAKE YOU UNCOMFORTABLE KNOWING THAT IT'S ON THEIR SIDE? NOT AT ALL. OKAY. NOT AT ALL. I SAME AS OUTSIDE OF CITY LAND.
I MEAN, PLANET BEACH. I'VE GOT STUFF. WAIT ON THE NORTH END OF MAYPORT ROAD.
YES. THAT'S TRUE. WE DO HAVE A LIVE STATION IN JACKSONVILLE.
RIGHT. SO, A CAVEAT QUESTION IN THAT I APPRECIATE COMMISSIONER BOLE BRINGING THIS UP.
ONE OF THE QUESTIONS I HAD TO THE CIVIL ENGINEER WAS, WOULD THE HOOKUP BE THE SAME FOR FIRE SUPPRESSION AS IT WOULD BE IF THEY WANTED TO HOOK UP TO OUR POTABLE WATER SYSTEM? IS IT TRUE? NO, WE LIKE I SAID, IF WE DON'T WANT TO SUPPLY THEM WITH POTABLE WATER.
OKAY, THAT'S NOT WHAT THIS WAS ABOUT. IT'S ONLY FOR FIRE.
OKAY. IS THE CORRECT PRONUNCIATION POTABLE OR POTABLE WATER? HOWEVER YOU WANT TO SAY, I THOUGHT IT'S POTABLE.
POTABLE, POTABLE WATER. AND I WANT US TO GET IT RIGHT GOING FORWARD.
IT HAS NO R IN IT, THOUGH, LET'S JUST PUT IT THAT WAY.
YES. RIGHT. YOU KNOW, IN YOUR EXPERIENCE, YOUR PROFESSIONAL, YOU THINK THAT'S GOING TO HAVE TO BE REPLACED OR THEY'RE GOING TO HAVE TO GO UNDERNEATH? IT WILL DEFINITELY HAVE TO BE REPLACED, YEAH. BECAUSE HE.
[00:15:04]
SO IT'S DEFINITELY GOING TO BE. AND IT WOULDN'T HARM TRAFFIC IN ANY WAY.NO, NO THEY'RE GOING TO BORE UNDERNEATH IT. IT'S GOING TO BE TEN TIMES THE DIAMETER OF THE PIPE.
BUT. THANKS. ALL RIGHT. AND THEN IF WE CAN GO ON TO THE NEXT.
THEY ARE REQUESTING AN EMPLOYEE. SO THAT WOULD BE A DISTRIBUTION OPERATOR TRAINEE.
HOW ARE WE DOING WITH THE LICENSE, FINDING PEOPLE WITH THE APPROPRIATE LICENSE? VERY HARD TO FIND SOMEONE WITH. LIKE A CDL. WE DON'T HAVE ANYBODY FOR YOUR SLEDGE TRUCK YET, DO WE? SLEDGE TRUCK? YES. YEAH. YEAH YEAH, YEAH.
I HAVE A DRIVER. I STOLE ONE FROM PUBLIC WORKS.
SO I'M STILL DOWN AT DRIVER. IT'S JUST BEAUTIFUL.
YEAH, MY LONGTIME DRIVER RETIRED, SO I HAVE TO GET A REPLACEMENT.
SO I WAS LUCKY ENOUGH TO HAVE ONE FROM PUBLIC WORKS.
OKAY. DO YOU HAVE THE PRESENTATION IN FRONT OF YOU, TROY? THE WHO? THE PRESENTATION? YEAH, NOT THAT I DON'T, BUT I HAVE THE ENHANCEMENTS.
DO YOU? YEAH. CAN YOU. TELL ME WHAT PRIORITY NUMBER THE FLOOD ONE IS? THE WHICH ONE? FOR THE CLUB. THE POND? WELL, IT'S NOT LIKE YOU SAID.
I SAW IT ON YOUR CAPITAL. YOU WERE CORRECT. IT'S NOT ON HERE.
IT'S ON THE CAPITOL. IT'S INCLUDED. YEAH. YEAH.
OKAY. YOU WERE CORRECT. ALL RIGHT. IT'S NOT IN THE ENHANCEMENTS.
SO FOR ME. YES. SO WHAT DO YOU HAVE A START DATE FOR THAT? AND AN ESTIMATED COMPLETION DATE? WE'RE WAITING TILL.
WELL, WE DEFINITELY WANT TO MAKE SURE IT GETS APPROVED.
OKAY. BUT WE WOULD JUMP ON IT RATHER QUICKLY AFTER THAT BECAUSE WE KNOW IT'S A PRETTY SOUL.
EXACTLY, EXACTLY. EXACTLY. SO I MEAN, WHAT IS THE FINAL PROCESS OR FINAL? SO THE BUDGET WILL BE APPROVED THAT SECOND MEETING IN SEPTEMBER, AND THEN IT WILL BE EFFECTIVE OCTOBER 1ST.
SO YOU COULD ESSENTIALLY START THEN IF YOU WANTED TO.
EXACTLY. OKAY. THAT WOULD BE THE HOPE. ALL RIGHT.
THANKS TROY. YEAH. OKAY. UNLESS THERE'S ANY QUESTIONS ON THE ENHANCEMENTS.
THIS PRESENTATION IS OVER. MR. CHAIR. VERY NICE.
AND SO, COMMISSIONER KELLY. HAVE YOU GOTTEN US A.
NO, I HAVE BEEN UNSUCCESSFUL IN FINDING A PRONUNCIATION.
I THINK THAT'S POTABLE. BUT YEAH, AND THAT'S THE BEST REFERENCES.
READY? I'M GOING TO PRESS. IT'S ACCORDING TO BEING.
ARE YOU? LIKE [INAUDIBLE]. I'M TURNING IT UP FOR A WHILE BECAUSE I KNOW YOU GUYS LOVE HEARING.
HEY, WE'RE GOING TO LEARN HOW TO PRONOUNCE WATER THAT IS SAFE FOR DRINKING.
THIS WORD IS PRONOUNCED AS POTABLE WATER. YEAH, P O H, PRONOUNCE P O H.
WE'LL HAVE THE NEWS HERE AND SO ON, AND WE REALLY WANT TO GET THAT RIGHT.
I WILL CALL THE NEWS. POTABLE WATER. THANK YOU.
ALL RIGHT. DO WE HAVE NO FURTHER BUSINESS THEN? COMMISSIONERS, COMMISSIONERS. IF YOU, IF WE'RE DONE NOW YOU DON'T GET TO GO HOME.
SO FEEL FREE TO ASK A QUESTION. WHY ARE YOU PAVING MAYPORT ROAD SIDEWALKS? I WAS WONDERING. WE'RE DOING WELL ON MAYPORT ROAD. THIS GAVE YOU THIS? OH, THIS IS THE BIKE PATH. THAT'S THE BIKE PATH.
FOR THE. LADY. I MEAN, WE HAVE OUR SOME VALVES IN THE ROAD THAT HAVE TO BE LOWERED.
WE HAVE SOME MANHOLES THAT HAVE TO BE LOWERED.
YEAH. SO THEY'RE ENGINEERING NOW. THEY'VE ALREADY GONE THROUGH THAT PROCESS.
WE'RE GOING TO PAY THE CONTRACTOR THIS KIND OF MONEY TO DO THE WORK WHILE THEY'RE THERE.
WHERE IS THAT MAYPORT ROAD BIKE PATH? WHEN DOES IT START OR.
WHERE IS IT? WHERE? FROM THE FLYOVER TO LEVY ROAD OR LITTLE BEYOND? MAYBE.
ME TO ENTER INTO A CONTRACT WITH FDOT. IN WHICH WE WOULD JUST PAY THEM THE MONEY TO MOVE THE UTILITIES THAT WERE IN THE ROAD BECAUSE THEY WOULD GET A BETTER PRICE THAN US, AND IT ELIMINATES THE FINGER POINTING. SO IF SOMETHING GOES WRONG, THEY CAN'T POINT AT US.
AND THAT'S ALL THEM. THAT'S GOOD. SO THEY GAVE US, THEY GAVE US A PRICE.
AND IT WILL ONLY BE ON THE EAST SIDE? THEY WILL DO WHAT? IMPROVEMENTS WILL ONLY BE MADE TO THE EAST SIDE OF MAYPORT ROAD, NOT TO THE WEST SIDE OF MAYPORT ROAD.
[00:20:02]
I BELIEVE MOST OF YOUR WORK WILL BE ON THE EAST SIDE, BUT I THINK WORK WILL BE UP AND DOWN MAYPORT ROAD DURING THAT.I'M NOT SURE WHAT THE PLANS ENTAIL, BUT I KNOW YOU'RE MISSING A LANE.
YOU'RE GOING TO MISS A LANE ON THE EAST SIDE OF THE ROAD. YEAH, IT'S A MEDIAN WORK AS WELL.
OKAY. OKAY. ALL RIGHT. IF THERE'S NO FURTHER BUSINESS THIS MEETING IS ADJOURNED.
BE HERE IN 40.
* This transcript was compiled from uncorrected Closed Captioning.